Hi TC,
I have an issue with the E&P Form Builder.
I’m trying to build a workflow that depending on the quantity, all prices in all next steps should differ (Apply reductions on quantities).
first step: the visitor should choose the quantity (and based on that the form applies reduction on quantity). Here everything is perfect. See youtube as example i choose 100pieces, which gives a reduction price of 3,02 which displays and calculates correct.
second step: visitor should choose between options. as test i only put one option, when selecting this a reduction price for this option is choosen based on the quantity of the first step. Here it displays in my youtube example: 1.23 as reduction price, which is also perfect
But now the mistery begins: upon checking the shoppingcart or final step princing tot overview displays 92.25 for 100pc as total for the second step whereas this should be 123?
Here’s a link to a youtube movie posted by myself to show you this mistery: https://www.youtube.com/watch?v=6toThiWcZTQ
Can anyone explain me what i’m doing wrong?
Thanks,
Thierry

